Design
Installation
All internal and external joint shall be sealed with an appropriate selected sealant to form an effective vapor seal. The sealant shall be accordance with specification. Entire walls can be put up quickly, reducing dry-in time. SIPs can be supplied as ready to install building components when they arrive at the jobsite, eliminating the time needed to perform individual jobsite operations of framing, insulating, and sheathing sticks-framed walls. Window openings may be precut in the panels, and depending on the size, a separate header may not need to be installed. Electrical chases are typically provided in the core of panels, so there is no need to drill through studs for wiring.